In addition to completing in-situ remediation activities throughout the winter Vertex can undertake assignments in extremely remote locations. Vertex recently won a competitive bid project and succesfully completed an injection of 24,000 kg of activated oxidant at a heavily-treed, remote
Introducing the HPT
Vertex would like to introduce it has the ability to measure subsurface permeability in real time using the Hydraulic Permeability Tool (HPT). The HPT is a logging tool that measures the pressure, using a down hole transducer, required to inject
Vertex Invited to Speak 2013
Over the past year Vertex has been invited to speak at conferences across Canada and internationally. Conferences that Vertex has spoken at in 2013 include the following; SMART Remediation: Toronto SMART Remediation: Ottawa SMART Remediation: Halifax SMART Remediation: Edmonton SMART
PHC’s – Bedrock Drinking Water Well Protected
Click to download: PHCs Bedrock Drinking Vertex Case Study
MTBE – Groundwater Plume Treated Within 1 Year
Click to download: MTBE Groundwater Plume Treated Within 1 Year
TCA – Remediation Success Gets a Direct Push
Click To Download: TCA Remediation Success Gets a Direct Push
PCE – Business as Usual Through the Remediation Process
Click to download: PCE – Business as Usual Through the Remediation Process
Heavy Metals – Direct Push Injection Yields Rapid Results
Click to Download: Heavy Metals – Direct Push Injection Yields Rapid Results
TCE – Rapid Results Enable Real Estate Sale
Click to Download: TCE – Rapid Results Enable Real Estate Sale
PHCs – In-Situ Injections Revitalize Historic Site
Click to Download: In-Situ Injections Revitalize Historic Site